Wrike is an award-winning software for online project management that was designed with a single goal: to improve the speed and efficiency of work in both co-located and distributed groups. The flexibility provided by Wrike enables multifunctional groups to collaborate and get things done effectively from a single location. The service allows you to schedule, prioritize, discuss, and keep track of both work and progress in real time — all with just a few clicks of the mouse.
Wrike has been the project management software of choice for many Fortune 500 companies, such as, Google, Stanford University, Adobe, HTC, and EA Sports to mention a few.
A detailed review of Wrike prepared by our experts is also available with a thorough analysis of Wrike capabilities and features.
Show MoreAll Wrike reviews confirm that this solution is loaded with business collaboration and information management features that will take your business a higher level. Benefits of using Wrike include:
3-Pane Project View Provides Important Data at a Glance
Wrike’s 3-pane layout lets you view important data on one screen, giving clear visibility on project operations. The details of all projects are on one page enabling you to quickly work on tasks. The left pane shows the project hierarchy allowing you to work on subtasks or move across different projects. The middle pane shoes the project’s task list. The right pane shows task details. You can do the following tasks from within the 3-pane view: ask for updates from your team members, prioritize tasks, communicate with your team members, and monitor and control work progress.
Tags and Folders Help You View and Share Project Data
Wrike gives you the ability to put an item in different folders without duplication. Wrike’s tags and folders enable you to view or sort data by tasks, projects, or any other way. You can name the folders based on how you want to sort data. The important thing is a task can be grouped in many folders but it is not duplicated. It stays as a single file and all changes in the task are reflected in all its folders. You can also use the tags and folders to share tasks with other teams and your clients.
Use Activity Stream and @mention to Engage Your Team
The Activity Stream enables project managers to see the big picture as well as micro-manage small tasks. The Stream pane and its widget in the Dashboard show your team’s activities. All shared activities can be seen in chronological order. Plus, you can unfollow activities to de-clutter the Stream. The main advantage is all your team members can view each other’s activity progress. You can use the @mention feature to draw attention to specific issues. The recipients get notified in their Stream and are automatically tagged as followers of the task discussion. This way, all your team members can a get a full view of what’s being discussed.
Task Tool Helps You Track Individual and Overall Progress
One of this Wrike review highlights is the ease with which this solution lets you break projects into small tasks. Subtasks can be further broken down into specific activities. Each activity can be marked as complete or incomplete which gives you an accurate picture of unresolved tasks. This makes it easy to manage and focus on smaller subtasks. The task tool helps to identify bottlenecks that hold up a project’s progress. The task timeline helps you to prioritize important tasks. To clarify a task, you can attach files, show pictures or tables, and cross-link to other tasks. In short, subtasks give you a clear idea of how much work needs to be done, by whom, and by when.
Excellent Analytics for Easy Reporting
Wrike’s powerful analytics helps you easily create reports to show to your company’s top executives as well as stakeholders. You can generate Global Reports that show the tasks from all your folders. The report shows project data in eight categories. The Performance Chart gives a visual look at how your project tasks are coming along against their deadline over a time graph. This graph helps you estimate individual and team work pace as well as project completion date. The Folder Statistics on the right pane of a project folder shows important task metrics like status and due date, on a weekly basis.
Powerful Integrations for Painless Data Migration
With the large list of meaningful integrations Wrike has to offer, your team’s needs for undisturbed task management will be completely covered. To start with, you have the impeccable email integration allowing you to create, assign, or edit documents directly from a preferred email account. Secondly, you get to use your Google Apps Marketplace credentials to access the system, and the powerful Google Drive connection to collaborate with other team members, attach and send files easily. The list, however, doesn’t end here: Wrike functions flawlessly with Jira, Dropbox, MS Project, Zapier, Salesforce, and many other apps that are important for your business workflow.
Collaboration Features for Creative Teams
How many times have you struggled with administrative difficulties to the extent of missing your creative flow?From now on, Wrike will dedicate an entire set of its amazing features to creative marketing teams that want to skip, or at least simplify their administrative burden. A single request will be enough to trigger a creative journey, and manage tasks rapidly and accurately. The Wrike requests will be available via URL so that even non-Wrike users can access them, and will support file uploading for better visibility and context clarity.
Audit Reports for Enterprise-Grade Users
Another powerful innovation by Wrike are enterprise-grade audit reports, allowing the admin to track both individual and group activities to prevent data breaches and any other type of malicious activity. The feature is now adjusted to Enterprise customers, who can launch an audit report to examine internal and external threats, and protect their data and their operations. These reports are handiest for tracking and clarifying group lifecycle changes, keeping actions accountable even when performed from a different location, and projecting permissions to intervene in every operation.
Advanced Forms and Requests
Our Wrike review also showed that the vendor invested serious efforts to simplify and prioritize work requests for teams heaped with emails, chats, and meetings. Unclear work priorities are the most common reason for inaccurate and complex management, and that’s exactly what Wrike’s forms aim to eliminate: they shorten the time needed to complete a project, reduce costly errors, miscommunication, and rework, and improve progress visibility for your main stakeholders. There are also many easy-to-customize requests, such as New Project Requests, Issue/Change Requests, Proposals, Creative Briefs, and so on, which you can use to standardize the submission process, and to shorten the time needed to begin working.
You can also read a Chinese version of Wrike review here.
Show MoreWrike for Project Management Teams
Problem: Unaligned and unfocused teams, and costly delays
Solution: Using Wrike, project management teams obtain flexibility to manage multiple projects and tasks at once, and to access all relevant up-to-date information to unite planning with execution. To make matters even better, Wrike allows them to generate all sorts of accurate reports, as it doesn’t only zoom in the full picture of their progress, but examines each task separately.
Wrike for Marketing & Creative Teams
Problem: Improper response to customer expectations, and severe administrative burden
Solution: Wrike is at the same time a powerful marketing solution which helps teams exceed their customers’ expectations. The secret of developing the perfect marketing strategy hides in the interactive timelines which display connections between dependencies, and help teams track performance, develop the appropriate assets for their campaigns, and manage and launch a variety of useful events. On top of that, Wrike is suitable for creative teams, as it provides an Adobe CreativeCloud extension that covers admission, approval, and similar administrative issues to let teams focus on their creative ideas.
Wrike for Product Management Teams
Problem: Slow product development, due to inaccurate prioritization
Solution: In our Wrike reviews we found that this software is a one-stop-shop for improving product development and delivery, as it enables teams to prioritize between requests, and assign them in an agile way which will keep management under control from concept to completion. It is a wise system for managing resources which breaks silos down, and keeps everyone focused on their tasks to accelerate delivery. Wrike’s robust feature suite will eliminate any product development concern, as it comes packed with a Live Editor, File Management Kit, Gantt Charts & Timelines, and the compulsory reporting functionality.


Bearing in mind businesses have particular business requirements, it is sensible they abstain from picking a one-size-fits-all, ”best” business application. Just the same, it is difficult to try to discover such a software solution even among sought-after software products. The correct thing to do would be to write the different main factors that demand inspection such as important features, costing, technical skill capability of staff members, organizational size, etc. Thereafter, you should do your product research exhaustively. Browse through these Wrike analyses and look into the other software systems in your shortlist more closely. Such all-encompassing research ensures you avoid unsuitable applications and buy the one that includes all the tools your business requires in growing the business.
Wrike Pricing Plans:
Free
$10/user/month
$25/user/month
average of $45/user/month
by quote
Wrike Pricing Plans:
Free
$10/user/month
$25/user/month
average of $45/user/month
by quote
Wrike software offers 5 flexible enterprise pricing plans designed to suit the varying needs and specifications of businesses, organizations, and independent professionals. A free plan for teams with unlimited users is also included. You can easily start your free trial of Wrike here.
Here are the details of all the plans:
Wrike Free Plan
The Free Package is great for a small team and is available for unlimited users. Other features include:
Managing tasks
Discussions in tasks
File sharing
Real-time activity stream
Spreadsheet view
iPhone/Android apps
Advanced email integration & notifications
API
Enterprise-grade security
Folder hierarchy
Subtasks
Wrike Team Plam – $10/user with packages of 2-15 users (billed annually).
This plan is ideal for teams that need project planning and collaboration. Features include:
All features from the Free plan
Generative AI
Automations
Cross-tagging
Storage space up to 2GB per user
Dynamic timeline (Gantt Chart)
Custom widgets and shareable dashboards
MS Project, Excel, and RSS integrations
Integrations & open API
Wrike Business Plan – $25/user/month (billed annually)
This plan works well for teams with 5-200 users, in need of robust work management with customization and exec reporting.
All features from the Team Plan
Custom fields & workflows: The ability to track anything related to your work. Customize workflow stages to fit your process.
Shared real-time reports with scheduled notifications: The powerful and easy-to-use report builder lets you visualize and share project status. Subscribe to scheduled notifications to stay on track with regular report updates and reviews.
Report templates: Use Templates to create reports in seconds. Edit or build reports from scratch using additional filters and groupings. Select column, bar or table charts.
Graphical analytics: View compelling charts and graphs about any project, folder or tag, and add them to your dashboard. Compare baseline plans to current status. Include column or bar charts in reports.
Resource management: Allocate people to tasks and projects, resolve schedule conflicts, and reorganize assignments with just a few clicks.
Request forms: Requests provide the structure and control you need for work intake so you get the right information from the start.
Time tracking: Track the time spent on a particular task and create time reports for a group of tasks at any given moment.
User groups & permissions: Group your team members (e.g. accounting, marketing, design etc.) for easier user management and control while advanced privacy settings allow you to control team activity.
Salesforce integration
Branded workspace: Align the look and feel of your Wrike workspace by replacing the Wrike logo with your own.
Adobe Creative Cloud Extensions
External requester collaboration
Ai risk prediction & work creation
5GB storage per user
Wrike Enterprise Pricing
by quote (the average price is about $45/user/month)
A flexible plan for enterprises that can support from 5 to thousands of users. This plan is ideal for teams that need customization, reporting, and advanced security. The actual pricing is influenced by factors such a number of seats, type of license (annual or monthly), premium support/implementation etc. Features that come with this plan include special functions like custom access roles, audit reports, and extended security controls among others.
All Professional plan features
Storage space of 10GB per user
Custom access roles
User audit reports
Automation engine (1000 actions/user/month)
Single sign-on
Extended security controls
Admin permissions
Tableau integration
Business intelligence API
Wrike Pinnacle Pricing
This plan offers advanced tools and analytics for teams from 5 to thousands of users. It is ideal for larger businesses that require robust reporting, digital asset management, and security software. Features include:
All Enterprise plan features
Locked Spaces
Advanced reporting and BI
Team utilization and performance dashboard
Job roles
Budgeting and billable hours
Bookings (project level effort & time planning)
SharePoint and HTML5 proofing and approvals
Digital asset management integrations
Digital asset management API
Automation Engine (1500 actions/user/month)
15 GB storage per user
You can request a pricing quote from Wrike here.
We are aware that when you choose to get a Project Management Software it’s important not only to find out how professionals score it in their reviews, but also to find out if the real clients and enterprises that purchased it are actually satisfied with the service. That’s why we’ve devised our behavior-based Customer Satisfaction Algorithm™ that collects customer reviews, comments and Wrike reviews across a broad array of social media sites. The data is then presented in an easy to digest format indicating how many users had positive and negative experience with Wrike. With that information at hand you will be ready to make an informed buying decision that you won’t regret.
Devices Supported
Deployment
Language Support
Pricing Model
Customer Types
Wrike is designed to work with other applications and software to make things very easy for you and your collaborators. Check out Wrike’s partners:
Wrike average rating:
Overall impression
Customer Support
Value for Money
Ease of Use
Write your own review of this product
ADD A REVIEWThe most favorable review
PROS: Ease of Use, limitless collaboration and ability to locate colleagues and share knowledge.
CONS: Ability to ha e forums to share errors and received support from community.
The least favorable review
PROS: A very powerful project management tool with some good features
CONS: Be careful with Wrike - after being a customer for 2 years they massively increased our renewal price. It's now totally unaffordable and we're having to move to an alternative, which is especially annoying after the amount of time it took to train our staff in Wrike.
More reviews from 42 actual users:
Sort by:
Wrike – intutive and flexible tool
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: This tool is flexible and easy to use. Its support team is great and it provides great videos that help you to better understand this tool. Our team found new way of collaborating and they have really improved the delivery time and reduce the meeting hours for checking project updates.
CONS: First of all, there is no way to automatically export report into PDF format, I have to log in check the reporting system every single day. I’d really like to receive print report in my email. Also, they could make the request from builder more flexible.
We have found Wrike as helpful solution for our organization
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: What I like most about Wrike is its flexibility. It allows you to customize the experience the way you want so it can suit all your needs. We were searching for a solution so we can replace home-grown software that is written by someone who no longer works at our place. We are non-profit organization and the price that Wrike offers is great.
CONS: We use this software for more than 3 years, whenever we run into some issues or misunderstandings we call its customer team and they resolve the solution for us.
Good software, Inflexible business practices
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: Love the product at first. Sadly In 2 of my companies, and in one i know the same thing has happened. We evaluated the software, and the team for one reason or another decided not to use it. Wrike became UNREACHABLE and INFLEXBILE. The do not allow for size or contract downsizing, if you slow or stop using it. For a small firm $1000/month is insanely high for a project management software that you do not use. No matter what we said, they will not compromise even slightly. So we are paying $12K!!!!!! extra for sofware we no longer use. Steer clear of this company if you are using for corporate use. 1 or 2 people maybe ..
CONS: duct at first. Sadly In 2 of my companies, and in one i know the same thing has happened. We evaluated the software, and the team for one reason or another decided not to use it. Wrike became UNREACHABLE and INFLEXBILE. The do not allow for size or contract downsizing, if you slow or stop using it. For a small firm $1000/month is insanely high for a project management software that you do not use. No matter what we said, they will not compromise even slightly. So we are paying $12K!!!!!! extra for sofware we no longer use. Steer clear of this company if you are using for corporate use. 1 or 2 people maybe ..
One of the best organizational tools in the market today
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: I like that Wrike helps me to stay on track of all the tasks and to organize them, it reminds me to accomplish the things I need to get done by due dates and priority. It is a flexible tool that can be used by any kind of business because it helps you to keep the team together and connected during the projects, it allows you to assign tasks to other members.
CONS: They could make the layout of Wrike more intuitive because it can be little hard to learn it at the beginning.
eXo best collaborative tool
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: Ease of Use, limitless collaboration and ability to locate colleagues and share knowledge.
CONS: Ability to ha e forums to share errors and received support from community.
Wrike is all in one project management solution
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: There are lot of helpful features within Wrike starting from Gantt chart- that helps you with complex projects that require different tasks or phases in order to be completed, to Folders & Projects- Organization that helps you to manage projects from different angles like: customer-driven, sales-driven, marketing-driven and it allows you to manipulate and move projects into various folders. The Tasks feature allows you to assign the tasks to different people within the team. There is even an option for duplicating folders with their tasks
CONS: I’d like to create dependencies between projects. In addition, when I want to change a tasks’ deadline it automatically changes the subtasks’ deadline and whenever I want to push some things forward/backward with Gantt chart I need to go into each subtask to adjust them as well. Also, the duration can be complicated especially when we have several tasks and we are not sure about the actual time on a given day whether it is enough or not.
Top project management software that is efficient
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: It has the ability to manage complex tasks processes under a single roof and its simple to navigate . Monitoring of project progress is easy and we still use this platform to communicate with other team members during collaboration.
CONS: The mobile functionality can be improved to make easier to work while outside office using Wrike. All other aspects function as expected.
Charged during our trial period and they wont refund
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: Overall, this product is not very user friendly and has restrictions based on the subscription level.
CONS: There are a lot of basic features that are excluded from lower subscription plans forcing you to pay for more than what you need. My card was charged during my trail period and they wont refund the subscription even though I chose to cancel during the trial period.
Poor value for money
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: A very powerful project management tool with some good features
CONS: Be careful with Wrike - after being a customer for 2 years they massively increased our renewal price. It's now totally unaffordable and we're having to move to an alternative, which is especially annoying after the amount of time it took to train our staff in Wrike.
Helpful solution for managing all your tasks and projects
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: Wrike is made for managing various projects with various team members. We use it to keep track of all the activities during the last week and while performing weekly team meeting. It allows you to create project and subtasks within the same project. I like the upload attachment feature so we can easily track the tasks that are related to specific documents instead of searching them through emails. Also, the dates on the tasks is also helpful and I like that I get To Do list emailed with all the dates prioritized.
CONS: Sometimes I forget to use Time Tracking feature. Also, when I get an email that someone is editing a task it can be difficult to match up the email and what I see on Wrike. Additionally, it can be difficult to locate specific tasks when they are moved or marked inactive.
It is an effective and powerful tool but complex at the same time
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: I like how they planned the functionality of this product. It allows you to create new custom fields which is great thing. It offers multiple ways to review all your projects. You can view them as a list, in a timeline, in a workload and on boards. It is powerful tool and it offers great customer service and documentation.
CONS: They could update the interface and improve the mobile-app. Unfortunately, you cannot use this product on anything except on computer or tablet. Also, there are lot of features and you will need some time in order to learn them all.
This is my favorite project management tool
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: I like that I’m able to invite any contact so they can contribute to a project. Its UI is intuitive and it doesn’t require much time to learn how it functions. It allows lot of ways to view the tasks in a timeline and in a project, and this means that different users will get the information that is most relevant to them.
CONS: When dealing with numerous projects the deeper views and settings can be very complex. It is great tool but it has some complexity when it comes to multiple projects.
Project management for Marketing Teams
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: I really appreciate that it is not too complex as other collaboration tools get too carried away with all the details.
CONS: The reporting funcion could be a little more detailed. As a team lead I would like to know on some kind of dashboard who is working on what and which tasks have been completed.
Wrike simply creates “time”
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: Wrike simply creates "time". Having tired several free trials of various PM options, Wrike immediately offers the user a user friendly, intuitive, and contemporary framework/design. Thorough analytics with a variety of views generated with less than 1-3 clicks; ahhhhh measurement, tracking with little to no effort or time...you can apply the time and efforts on actual projects and tasks. The collaboration and all in one hub design gives back HOURS in day bc you aren't chasing, searching, categorizing emails to find the trail of info, drafts, approvals, etc. The Outlook integration is tops - communications with wrike application users and external to wrike. With Wrike, you can have scheduled reports, daily view tasks, etc. sent to yourself, others, or a distribution list, and all have links to the specified items. And not enough room here for app praise. (The app rocks)
CONS: The export to excel functionality could be improved upon.
Wrike is a realy simple and very flexible solution
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: Other solutions we used so far do not match the simplicity and flexibility of Wrike. Its creative arrangement of folders enables us to sort tasks by agency client and department. We also use Wrike’s API to place the tasks into our custom marketing reports each month. Plus, Wrike’s draggable waterfalls view and overall interface are a dream to work with. At the same time all these features do not hamper Wrike’s flexibility at all.
CONS: Wrike’s default dashboard as well as reporting feature could be improved. However, I understand that Wrike is not a custom app designed specifically for our company’s needs. For example, we have a range of alarms for many types of metrics and these issues cannot be solved by Wrike or any other software for that matter as they are not written specifically for them. Apart from these issues, we find Wrike is a perfect software.
Wrike rocks out!
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
PROS: The collaboration and organization that we've gained from this are amazing!
CONS: It takes a while to fully get accustomed to the program, but that is a minor thing.
Overall impression
Best PM tool I have came across till date. This tool works seamlessly & has many features that can make the project management easy & very simple. Wrike can be integrated with Outlook & Jira and is available on every leading mobile platforms.
Overall impression
Wrike is a fantasic and intuitive project management tool. Pros: Fast set up, integrates with everything, good reporting features, easily customisable. Cons: it should be easier to conttrol email notifications. I would highly recommend using Wrike.
Overall impression
Its a good tool, it helps me to mangage the tasks, checking it progress all the time.Great project management app that helps me stay up-to-date with my work progress. Pros: advanced reporting, gantt chart and dashboard – all I need to efficiently manage my projects Cons: I’d really appreciate task reminders and a more robust Google Calendar integration
Overall impression
Wrike is my preferred project management software. It's extremely easy to use and has more features than any other program out there. I need to be able to see 100 different things in 50 different ways all while keeping it simple, clean, and organized. Wrike does this flawlessly. My favorite features include the Gantt chart, workload view, timelines, collaboration with Outlook and Office 365, and time tracking. The only thing I sometimes struggle with in Wrike is loading time, but with how much it can do, it makes total sense why it sometimes lags a little.
Overall impression
I would be lost without Wrike. I tried the other big names and they had too much stuff that I didn't need that got in my way. Wrike is elegant and easy to use but contains all the tools I need. The Gannt charts are perfect and make my projects look just as professional as the people using the expensive software.
Overall impression
We are using Wrike over 2 years. I find it flexible and powerful, tasks can be easily categorized to allow you to handle your work in a variety of ways. Wrike is very useful tool for managing projects and tasks which makes your work easier and more effective and it helps the department in our company to keep organized. The communication between other departments in our company is much better and helps to get things done more effectively. The email to task function and the google chrome integration are perfect goodies. In dashboard you have a perfect overview to all assigned, to do and overdue tasks and in activity stream you get news about the work that is done in your team. Wrike is improving continually and over time they have developed many new features in order to achieve better efficiency. Best of all, they take user feedbacks to make their changes. I'm looking for new ideas, they will surely come up with.
Overall impression
We have tried a few different Project Management Websites. First was Basecamp, simple and clean, but we wanted more. Tracky was buggy and continually changing their system and personality. Wrike was more expensive, but you do get what you pay for, and what you get is well worth it.
Wrike came with the features we wanted. Email support, so you can respond to tasks inside emails. Task sharing with those that are outside the organization. A UI that is easy to understand. Cloud storage and document support.
Wrike is also very reliable, it just works. Other software we tried was just to buggy and temperamental, it doesn’t matter how many features you have if they don’t work when the customer tries to use them (I’m looking at you Tracky, Microsoft, software developers in general).
It’s been over a year since we began using Wrike, and they continue to improve and and value. They also respond to the community and add much asked about features, i.e. Sub-Tasks. Their user interface gets easier to use with each update, thank you dashboard and descendent-tasks.
I do wish that Wrike included more user accounts for our level. It’s hard to figure out if a person is a “User” (able to create tasks) or just a “Collaborator”. And I would like them to have add the ability to have external bug task creation.
Summary: Wrike is worth the money, the system makes since to users, they are adding great features with each update, and have great customer support and documentation. Spend the money and get software that really helps you and your team work better.
Overall impression
We've been using it for about 6 months and I've never worked with such ease when it comes to tasks and projects. Its collaborative and customizable features make it very effective and easy to use. The reports you can generate to see how your workflow is working is great. Dashboards help you visualize the tasks you want to keep at hand.
Overall impression
We are using Wrike to quickly turn notes into activities and build on the current methods to do a continuous improvement of the processes that were in place before the PMO mindset settled in. Wrike has allowed us to collaborate with ease and to be able to communicate expectations quickly not only internally but also to external contributors. The multidimensional aspect of the folders comes in very handy when your projects are long and transversal on scope and resources. It is very convenient and being allowed to interact directly from the Gannt is a big win.
Overall impression
We've used Wrike for a couple of years. Wrike is a flexible project management tool that encourages information sharing among your team. We use it for our IT department and use it to track both our service work and our projects. One thing I especially like is their support team, when I come to them with questions that usually go beyond in their response. Taking the time to share idea on how we can make Wrike work better for us. The biggest challenge is getting deep enough into the use that the benefits come, it is too easy with any project management tool to use it after the fact, to use it only as a time tracking system. I find the strong communication functionality of Wrike helps your team get past this issue.
Overall impression
Before using Wrike, my company had no system flow or software to track the series of projects that were completed. This made it so that things fell through the cracks and pieces that were important to compliance weren't there. After implementing Wrike we have been able to have cohesive collaboration in all of our process. Increasing our productivity and insuring compliance in all fields. Wrike has been a great tool to help manage and communicate. I wish there was more functionality to the the professional version but it has been able to get is from the negative to a positive and now we can grow.
Overall impression
Wrike contains all the necessary elements (and then some) for a project manager to manage multi-project at one time and know the status of each project. Wrike significantly reduces the risk of tasks falling through the cracks that can result in delays in product roll-out to production and the market it serves. Wrike also provide easy accessibility to information on a project in real time through mobile devices. The one thing I like about Wrike the most is their customer service (value-added) and their consistent improvements to their software based on customer input.
Overall impression
Its a good tool, being a team leader it helps me to mangage the tasks, checking it progress all the time. Its mobile app is handy as well. overall its a good tool from side.
There are few areas where it needs enhancement which are related to reports, hoping wrike team will fix all those in next builds
Overall impression
It's a nice project management tool, I am an end user and found it very useful.
It's pros are email notification, task breakups and mobile apps
It's cons are complicated UI and time entry system. Hopefully Wrike team will look into this issue and they will provide something more simple.
Overall impression
After using several different programs to track new products and customization projects, we have found Wrike to be a very efficient solution for our entire company. In Wrike, we are able to set up and assign tasks necessary to complete projects, we can project completion dates thanks to the gantt chart and are able to store vital information in such a way that it is easy to access in the future. Currently the e-Learning Content Department is the primary user of Wrike, but it is accessible by the management team, sales, engineering, and customer service which allows us to communicate and collaborate company wide.
Wrike Pros:
Gantt chart — This helps with projects that are complex and require various tasks or phases to be completed in order to develop a final project. We simply could not plan product releases effectively without this!
Folders — Organization is incredibly important when managing projects for several different facets (customer-driven, sales-driven, marketing-driven, etc) and the fact that I can manipulate and move projects into different folders helps me watch a project as it travels through our “workflow” from inception to delivery.
Tasks — Not only developing unlimited tasks and sub-tasks with deadlines, but also being able to assign them to different people within our teams has allowed us to have a central point to work from. I highly appreciate the ability to duplicate folders with their included tasks as our workflow is often repeated for similar projects.
Wrike Cons:
I would like to see different statuses saved in different folders. Instead, the status is changed and it affects all folders globally. This has caused me some confusion or irritation at times.
With sub-tasks, I find myself wishing that changing a tasks’ deadline would also change the subtasks’ deadlines. When I push things forward or backward with the Gantt chart, I then have to go into each subtask and adjust them as well. Sometimes, it seems easier to make everything tasks so I can use the cause/effect of dependencies.
Duration can be confusing at times given that sometimes a task will take a bit of time daily over several days, but not necessarily all day. Group several tasks like that together and planning resources becomes difficult because you cannot distinguish how much ACTUAL time on a given day is needed for a particular project. I find myself planning by dates and not durations. I think if there were a way to use these independently, that would be helpful.
Overall impression
This is a very helpful tool that helps the offices to maintain in the same page according to the projects they have on queue it helps to those that actually use it to be more organized on their schedules. At the beginning it can be difficult to learn how to use, but now with the new features and images is becoming easier.
I have used it, and i think is really helpful but it requires the disposition of my whole team to use it in order for it to work, because other wise it is too much work for just one person to keep updating all the info on it.
Overall impression
I’ve been using the app for a year now and it meets my requiremets for all small business contractor projects. Pros: it helps me coordinate the day-to-day, weekly, and monthly goals. Real-time updates greatly diminish the risk of of assumptions and everyone is more accountable. Specifically, as a project leader, I like the simplicity of dashboards that my team leaders can create with this app. With drag-and-drop and board functions it’s easy to track the progress of each team’s progress. This helps me to quickly assess our overall performance with one glance. At the same time, by double clicking the board, I can drill down to details and activities of a specific team. The software combines macro and micro functions that let project leaders to shift from using strategic to tactical solutions and back. Cons: Ironically, I feel the board dashboard could have used a high-level view structure that can handle multiple layers of teams and subteams. It works for me for now because I only have one vertical, but for bigger projects with subteams down the line, the boards can easily get clunky.
Overall impression
A really nice PM tools which helps the user for their task integration. However it should be more user friendly. It requires a lot of time to get familiar with. However apart from that all other features are good. Email notification and mobile app are awesome.
Overall impression
Wrike is a really comprehensive tool for Time Management and Task Management. It is user friendly and offers a great amount of options for those tasks that require extra information. Being a deadline driven company, Wrike has helped our team be sure to meet all deadlines on time and effectively communicate to the field.
Overall impression
We’re a software vendor that focuses on custom enterprise solutions. We’re better off using non-core systems developed by others to remain efficient, focusing our attention instead on our custom offers. We really love Wrike because it helps us to implement a project management architecture right away. Pros: We love its features. We don’t have multi-tiered and complex dependencies, so Wrike’s straightforward task management and file management systems fit our needs. Email integration is handy and the dashboard feature is simple but useful. I also like the desktop notifications (they pop up in the corner), which make sure messages are not missed. We also have less than 15 members in our team so the pricing is just right. Cons: cannot brand customize the workspace. It doesn’t sound a major issue for other businesses, but in our industry (enterprise solutions) we look awkward and small time to be seen using other company’s software even if the app is not our core development area.
Overall impression
Wrike is a really good tool, better than other project management tools available in the market but it needs some improvements for reoccurring tasks support. For reoccurring task it is minimal & for a technical content meetings things are updated every week.
Overall impression
It’s hands down one of the simplest project management software to use. For companies like mine with weekly project turnarounds, ease-of-use is critical; you can’t lose a week just training people! The pros include: drag-and-drop functions are no-brainer. I just move the to-do boards across my schedule instead of copy-pasting data in a calendar or spreadsheet. Project updates and statuses are also drag-and-drop enabled, which makes grouping notices in one place as easy as dragging them beside each other. The @mention tool is also very practical to instantly get the attention of your recipients. Cons include: I’m a fan of Gantt charts since my MS Project days, but, admittedly, Wrike’s Gantt charts are way behind. If you’re not into this charting though this drawback won’t matter.
Overall impression
Wrike is the best project management tool I have used so far. We have tested numerous PM tools and were using Intervals for the last 2 years but then I got to know about Wrike. The experience of using it was great. The pros are: 1. Easy to use UI. 2. Availability on all popular platforms like iOS & Android. 3. Easy to create tasks and tagging people within the tasks. 4. Addons available for outlook & chrome. Cons: 1. There should be support for re-occurring tasks.
Overall impression
Wrike serves me very well, team emails can be done and manage easily. Working in a project becomes very easy and convenient when you have a great tool like this. The security measures is excellent, it only allows the recipient to get the necessary information. Team communication and updates are conveniently done.
Overall impression
What I like: - The ability to create as many projects/folders/tags as necessary - The dynamic Gantt-chart which allows you to set dependencies between tasks and adjusts with a click and drag - Numerous reporting options - Excellent support - Custom dashboards to monitor projects. What I dislike: - Custom calendars for employees are currently only available in the Enterprise edition, which is more costly - Activity stream can get cluttered quite quickly, meaning some information gets lost unless you are @mentioned This is the best project management software our studio has come across. Highly recommended
Overall impression
Great project management app that helps me stay up-to-date with my work progress. Pros: advanced reporting, gantt chart and dashboard - all I need to efficiently manage my projects Cons: I'd really appreciate task reminders and a more robust Google Calendar integration.
Join a community of 7,369 SaaS experts
Thank you for the time you take to leave a quick review of this software. Our community and review base is constantly developing because of experts like you, who are willing to share their experience and knowledge with others to help them make more informed buying decisions.
OR
Sign in with company emailSign in with company email
Wrike – intutive and flexible tool
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
We have found Wrike as helpful solution for our organization
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
Good software, Inflexible business practices
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
One of the best organizational tools in the market today
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
eXo best collaborative tool
Read full review >Overall impression
Customer Support
Value for Money
Ease of Use
Why is FinancesOnline free?
FinancesOnline is available for free for all business professionals interested in an efficient way to find top-notch SaaS solutions. We are able to keep our service free of charge thanks to cooperation with some of the vendors, who are willing to pay us for traffic and sales opportunities provided by our website. Please note, that FinancesOnline lists all vendors, we’re not limited only to the ones that pay us, and all software providers have an equal opportunity to get featured in our rankings and comparisons, win awards, gather user reviews, all in our effort to give you reliable advice that will enable you to make well-informed purchase decisions.